Case studies

Our projects
in the field.

Pilebyg® noise barrier at the Canadian Malartic Mine, Route 117 bypass, Quebec
Malartic, QC

Reducing noise from the Canadian Malartic mine and road traffic

A 350 m × 5 m woven willow Pilebyg® wall (5 dBA attenuation and 12,433 kg of carbon captured).

Sablière Demers in Mirabel (intensive willow revegetation, aerial view)
Mirabel, QC

Rehabilitating the sand pit without halting operations

13 ha under intensive revegetation (up to 268,800 willows planted and fertilizing residuals valorized on site, since 2017).

Evacap™ cover on the former Sept-Îles LES (aerial view, dense willow planting)
Sept-Îles, QC

Reduced infiltration at the Sept-Îles LES

Evacap™ cover over ~11 ha of the former sanitary landfill (LES): 80 to 94% of seasonal precipitation evapotranspired and leachate seepage greatly reduced.

Pilebyg® noise barrier along boulevard Industriel in Boucherville (aerial view)
Boucherville, QC

A residential neighbourhood brought back below the comfort threshold

A 750 m × 3 m Pilebyg® wall (back below the MTMD residential comfort threshold).

Willow variety trial in Fermont (Mont-Wright Mine, ArcelorMittal) after 1 year of growth
Fermont, QC

16 willow varieties under trial in the North (ArcelorMittal)

A varietal trial of 12,300 willows on 1.7 ha (16 varieties tested in northern mining conditions).

Mature Evaplant® planting at the Saint-Nicéphore LET, Quebec
Saint-Nicéphore, QC

Leachate and rainwater managed on the same site

Integrated management combining Evaplant® and Evacap™ for maximum performance.

Pilebyg® noise barrier at the Saint-Hubert Costco (aerial view)
Saint-Hubert, QC

A truck parking lot below the municipal criterion

A 51 m × 5.5 m Pilebyg® wall (City of Longueuil's 53 dBA municipal criterion met).

Evaplant® system and willow planting at the Neuville Environmental Complex, Quebec
Neuville, QC

Treating water at an environmental complex, without discharge

96,000 Evaplant® willows on 6 ha valorizing a former landfill (treating up to ~20,000 m³/year of water, without discharge).

Vegetated barrier at the Compo-Haut-Richelieu site (drone view, Saint-Jean-sur-Richelieu)
Saint-Jean-sur-Richelieu, QC

Screening a composting site behind willows

A ~400 m visual screen from a dense planting of ~16,000 willows to hide operations from the road.

Revegetation of the Sable Villeneuve sand pit in Terrebonne (drone view, Quebec)
Terrebonne, QC

A million willows to restore a sand pit

~50 ha revegetated with 1,000,000 willows and 5,000 t of fertilizing residuals (progressive rehabilitation of a sand pit at the end of its operating life).

Pilebyg® Classic noise barrier at the Sherbrooke Super C (Belvédère Sud) (aerial view)
Sherbrooke, QC

A grocery loading dock brought below 45 dBA

A 68 m × 3.5 m Pilebyg® Classic wall (45 dBA regulatory criterion met in the adjacent residential zone).

Evaplant® planting at the Evaplant® (Saint-Lambert-de-Lauzon LET) drone view, Quebec
Saint-Lambert-de-Lauzon, QC

Treatment of ~5,000 m³ of leachate without discharge

1.7 ha of Evaplant® on a former cell: ~5,000 m³ of leachate treated without discharge and ~117 t CO₂ eq. captured.

Woven willow fences between homes and a bike path in Saint-Constant, Quebec
Saint-Constant, QC

800 m of willow fence along a bike path

~800 m of woven willow fencing between homes and a bike path (demarcation, privacy and landscape integration).

Pilebyg® noise barrier around the basketball courts at parc des Riverains, Lavaltrie
Lavaltrie, QC

Containing noise from the basketball courts

A 35 m × ≥ 3 m vegetated noise barrier (simulated reduction of 5 to 15 dBA, Vinacoustik study).

Have a project in mind?
Let's talk.

Our team is available to discuss your needs and recommend the right solution.