Our projects
in the field.
50,000 m³ of leachate managed on-site every year with Evaplant®
~12 ha and ~205,000 willows: up to ~50,000 m³/year of leachate treated and ~430 t CO₂ eq./year captured.
350 m of Pilebyg® noise barrier between the Canadian Malartic mine and Route 117
A 350 m × 5 m woven willow Pilebyg® wall (5 dBA attenuation and 12,433 kg of carbon captured).
Revegetating 13 ha of sand quarry without halting operations
13 ha under intensive revegetation (up to 268,800 willows planted and fertilizing residuals valorized on site, since 2017).
An Evacap™ cover reduces infiltration at the former landfill
Evacap™ cover over ~11 ha of the former sanitary landfill (LES): 80 to 94% of seasonal precipitation evapotranspired and leachate seepage greatly reduced.
750 m of Pilebyg® noise barrier for a residential neighbourhood
A 750 m × 3 m Pilebyg® wall (back below the MTMD residential comfort threshold).
16 willow varieties on trial at the Mont-Wright mine (ArcelorMittal)
A varietal trial of 12,300 willows on 1.7 ha (16 varieties tested in northern mining conditions).
35,000 m³ of leachate treated without discharge by Evaplant®
130,000 Evaplant® willows on 8 ha treat up to ~35,000 m³/year of leachate without discharge and capture ~280 t CO₂ eq./year.
A Pilebyg® noise barrier brings a truck parking area under 53 dBA
A 51 m × 5.5 m Pilebyg® wall (City of Longueuil's 53 dBA municipal criterion met).
96,000 Evaplant® willows treat leachate without discharge
96,000 Evaplant® willows on 6 ha valorizing a former landfill (treating up to ~20,000 m³/year of water, without discharge).
16,000 willows screen a composting site
A ~400 m visual screen from a dense planting of ~16,000 willows to hide operations from the road.
A million willows and fertilizing residuals to restore a sand quarry
~50 ha revegetated with 1,000,000 willows and 5,000 t of fertilizing residuals (progressive rehabilitation of a sand pit at the end of its operating life).
A Pilebyg® wall brings a grocery loading dock under 45 dBA
A 68 m × 3.5 m Pilebyg® Classic wall (45 dBA regulatory criterion met in the adjacent residential zone).
5,000 m³ of leachate treated without discharge by Evaplant®
1.7 ha of Evaplant® on a former cell: ~5,000 m³ of leachate treated without discharge and ~117 t CO₂ eq. captured.
800 m of woven willow fencing along a bike path
~800 m of woven willow fencing between homes and a bike path (demarcation, privacy and landscape integration).
A Pilebyg® noise barrier against basketball-court noise
A 35 m × ≥ 3 m vegetated noise barrier (simulated reduction of 5 to 15 dBA, Vinacoustik study).
Have a project in mind?
Let's talk.
Our team is available to discuss your needs and recommend the right solution.
Updated
